EN CN

Aktuelles

+ + +

April 2020

Guiding the Klang Valley MRT Line 2 Metro Tunnel

The ‘Klang Valley MRT’ is a large-scale metro project designed to construct three subway lines with a total length of 150 km in Kuala Lumpur, Malaysia. The first construction phase, the ‘Blue Line’ from Sungai Buloh to Kajang, is 51 km long.

(mehr …)

Januar 2020

Albvorland Tunnel – Connecting Alb to Stuttgart

The Albvorland Tunnel is 8.1 km long and is part of Section 2.1 A/B of the Alb Foothills Connection to Stuttgart Rail Node project and comprises a twin bore of two single-track tunnels running almost on the same level. The site is part of one of the largest construction projects currently underway in Germany. (mehr …)