May 2015
Breakthrough at Wynyard Walk
Since July 2013 the work is going on at „Wynyard Walk“ in Sydney/ Australia (more…)
May 2015
VMT project engineer now tunnel patroness at BA30
After VMT has played its part with some (wo)man-power in the Emscher BA30 project, there is now a tunnel section that evokes our successful operation on the jobsite. (more…)
May 2015
Illingen-Wustweiler Sammler 1.0
Sharp curves in the sewer (more…)
April 2015
World record for Las Vegas
Mechanized tunnelling under high pressure (more…)
April 2015
Breakthrough at Elbedüker Hetlingen
1.5km of pipe jacking under the Elbe River became with the good cooperation with A.Hak Drillcon from the Netherlands a great success with a precise breakthrough and with comprehensive navigation and safety technology delivered by VMT.