DE CN

News

+ + +

May 2013

VMT navigates longest S-curve in the U.S. successfully to its target

Breakthrough at Santa Ana River Interceptor project in southern California was announced at 1st May 2013. VMT provided the navigation system.

Initially, the project was planned with few straight drives till the constructor decided for a combined advance. Please read more information here – within the article in North American Microtunnelling.

We´re especially pleased about the great feedback from above mentioned article: “Both the Jackcontrol and VMT systems will be utilized more in North America as the number of curved tunnel drives increases in the industry to save time and money, and reduce disruption.”

At this point, we like to thank Jackcontrol AG and James W. Fowler Co. for great teamwork!