May 2015
VMT project engineer now tunnel patroness at BA30
After VMT has played its part with some (wo)man-power in the Emscher BA30 project, there is now a tunnel section that evokes our successful operation on the jobsite.
Our client Wayss & Freytag named a reach of the TBM 6 after the responsible VMT project engineer Nadine Fenrich and rose her to the tunnel patroness of the section “Nadine”.
Of course we are very proud that Wayss & Freytag let us – respectively Nadine bestowed such an honor.
The construction phase of the BA30 “Emscher sewer” is on its last legs. The waste water will derived in closed channels in the future, in order to counteract the further pollution of the river Emscher.